CS04
Sheffield Hotel
Brief: To provide a full heat recovery Air conditioning system to meet heating & cooling requirements throughout the hotel working in conjunction with the consultant Thornley & Lumb to meet the client brief of cost effective, energy efficient & environmentally friendly air conditioning.
Solution: Toshiba 3 pipe Full inverter heat recovery systems with specialist night set-back panels in each room for fabric conditioning provided by Pacair frost stats.
Implementation: Working with: Air conditioning Economics – Sheffield.
To achieve a tight programme with various indoor ducted & wall mounted indoor units linked to VRF outdoor systems controlled by simplified wall controllers.
2006 was an exciting year at the Sheffield Park Hotel. Investing 3.5 million pounds will see the hotel upgraded to a 4* deluxe venue. The hotel is a contemporary venue situated on the outskirts of the City of Sheffield and ideally placed for both business and leisure in South Yorkshire and the Peak District. Set in a peaceful location the Hotel has easy access from the M1.